Review Before Sending

Review all documents before they are released to the client, contractor, bid, etc. It is important that the documents are checked that they are the most up to date version, …

Read more

Keep Documentation Professional

Work on the assumption that anything you put in the project file may some day be looked at in a court of law. Be careful with every document, photo, memo, …

Read more

Confirmation of Transmittals

Get confirmation from the client or contractors that they received transmittals. Make sure this is in writing (preferably a signed transmittal form).

Don’t Do Blanket Approvals

Don’t get blanket approvals on drawings or designs without each one being marked as approved by the client. A client may send documentation stating that the designs or drawings are …

Read more

Approval Time Limit

Make sure that the contract specifies the length of time allowed for approvals or decisions. When drawings or documents are sent to the client for approval, you need to know …

Read more

Always Act Professionally

Always act professionally in dealing with everyone involved with the project, even people just visiting or on site. Many people on construction sites may act in what is often expected …

Read more

Get Instructions in Writing

If a client representative asks or instructs you to do something on site (of any value or lasting effect) get it in writing before doing it. For example, if the …

Read more

Awareness of Details of Designs

Make sure contractors are aware of the details of designs. E.g. types or colours of pipe, colours of wires, flange types required. Make sure those details are in the contract …

Read more

Take Lots of Photos

If your company is involved in site inspections, site supervision, or site management take lots of photos. Make sure to file these photos by name (location, item) and date. Some …

Read more

Precedence Clause in Specifications

Make sure to include a precedence clause in the specifications. You should define which documents or sections take precedence. That way if there are errors or conflicts, one will take …

Read more

Cautionary Notes On Drawings

Make sure drawings have cautionary notes for areas of potential conflict (e.g. electrical wiring near nail fasteners).

Get Subcontractor Buy In

Get agreement on the final designs with subcontractors before submitting them to the client. You need subcontractor buy-in to the design. This gives you the opportunity to confirm they can …

Read more

Avoid Superlatives In Contracts

Avoid the use of superlatives in contracts and documents. E.g. “all, make sure, assure, insure, as necessary”. These can be interpreted as making a guarantee. It would be better to …

Read more

Allow For Inflation

Make sure to allow for inflation in cost estimates. Particularly allow for large increases in raw material costs (e.g. stainless steel, copper). This is important in the tender preparation process. …

Read more

Clarify Ownership Of Drawings

It is important to clarify the ownership of drawings your company produces. Make sure the contract or agreements clarify the ownership of drawings and documents. Some clients may expect the …

Read more